FSU - Ringling Museum-Waterfront Improvements
The project consists of site work including construction of two new retention ponds, storm-water system modifications, landscaping, irrigation, and hardscaping. The landscaping and irrigation work includes extensive additions to the area south of the Ca d’ Zan residence along the seawall on Sarasota Bay. The hardscape work includes a ten-foot wide, shell topped, concrete sidewalk adjacent to the seawall, brick paver patio area for large functions to be held under a tent and an associated catering area, benches, and gravel sidewalks. The parking and accessibility were enhanced with stabilized grass parking, asphalt and concrete drives, and a new traffic circle.