Cedar Hammock Fire Control District - Fire Training Tower
This project includes the demolition and removal of the current wooden structure, the demolition of an existing wooden obstacle course, removal and relocation of an existing gas mock-up, relocation and installation of a vehicle fire prop and extrication pit; relocation of a prefabricated survival maze; and construction of a 50’ x 50’ x 48’ (4-story) fire drill training tower.